Vučkovec Project

Investor
STSI integralni tehnički servisi d.o.o.

Category
Energy

Construction-craftsmanship and earthworks were carried out on the construction of facilities, technological pipelines and cables on the Vučkovec hydrocarbon exploitation field. The facilities at the Vučkovec hydrocarbon exploitation field include: the well working area BRP VUČ-3, the well working area BRP VUČ-1/5 and the Vučkovec node. There are technological pipelines and cables in the Vučkovec hydrocarbon exploitation field: connecting pipelines and cables from BRP VUČ-3 to BRP VUČ-1/5, technological pipelines and cables from BRP VUČ-1/5 to the node Vučkovec and technological pipelines and cables from the node Vučkovec to the junction Međimurje.

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save